Kia Sedona: Valve Clearance Repair procedures - Power Train - Maintenance - Kia Sedona YP Service ManualKia Sedona: Valve Clearance Repair procedures

Third generation YP (2014-2024) / Kia Sedona YP Service Manual / Maintenance / Power Train / Valve Clearance Repair procedures

Inspection
Check the valve clearance.
If necessary, adjust the valve clearance by replacing the tappets.
Spark Plug Repair procedures
Inspection [On vehicle inspection] 1. Accelerate the engine to about 3,000 rpm 3 times or more. 2. Remove the spark plug. 3. Check the spark plug visually. If the electrode is dry, the ...

Vapor Hose and Fuel Filler Cap Repair procedures
Inspection Vapor hose 1. Check all the clamps for tightness and the connections for leakage. 2. Visually check the vapor lines and hoses for cracks, leaks, loose connections, or deformation. ...

Other Information:

Front Driveshaft Repair procedures
Removal 1. Remove the front wheel and tire (A) from front hub . Tightening torque: 88.2 ~ 107.8 N.m (9.0 ~ 11.0 kgf.m, 65.0 ~ 79.5 lb-ft)     Be careful not to dam ...

Ignition key interlock system
The ignition key cannot be removed unless the shift lever is in the P (Park) position. Even if the ignition switch is in the LOCK position, the key also cannot be removed. If your vehicle is equi ...

Categories


Copyright В© www.kisedona.com 2016-2024