Inspection |
1. |
Turn ignition switch OFF and disconnect the negative (-) battery terminal. |
2. |
Remove the fuse box cover. |
3. |
Remove the starter relay (A). |
4. |
Check for continuity between the terminals (30 and 87) using an ohmmeter.
|
5. |
Apply 12V to the terminal 85 and ground to the terminal 86 and then check for continuity between the terminals (30 and 87).
|
6. |
Install the starter relay. |
7. |
Install the fuse box cover. |
Operating conditions
The indicator on the switch will illuminate when the Blind Spot Detection System
(BSD) switch is pressed with the Engine Start/Stop Button ON.
If vehicle speed exceeds 30 km/h (18.6 mph), the sys ...
Drive Belt Repair procedures
Removal and Installation
1.
Remove the engine room under cover and engine room RH side cover.
(Refer to Engine And Transaxle Assembly - "Engine Room Under Cover")
2.
To release the tension, t ...